"How much is the permit?" is usually the first question we hear — and the honest answer is that in Miami there is no single permit fee. What you pay depends on the jurisdiction (City of Miami, Hialeah, Doral, Miami Beach, or unincorporated Miami-Dade), the type of work, and the declared construction value the fees are calculated from.
This guide breaks down how permit costs are actually built in 2026 — the base fees, the plan review and upfront fees, the surcharges, and the costs that surprise homeowners the most: revisions, expired-permit renewals, and after-the-fact penalties. If you want a number for your specific project, our permit team prices it for free.
How Permit Fees Are Calculated in Miami-Dade
Almost every jurisdiction in Miami-Dade calculates the core permit fee as a percentage of the construction value — the declared cost of labor and materials for the work. As a rule of thumb, budget roughly 1.5% to 3% of the construction value in total permit-related fees for a typical residential project.
On top of the base fee, expect line items like these:
- Upfront / application fee — paid when you submit, typically $100–$400, usually credited toward the final fee.
- Plan review fees — each discipline that reviews your plans (structural, electrical, plumbing, mechanical, zoning) can carry its own review charge.
- State surcharges — Florida adds small percentage surcharges (DBPR and DCA) to every permit.
- Certificate fees — Certificate of Completion or Certificate of Occupancy fees at the end of the project.
- Impact fees — for new construction and additions that add living area, county and municipal impact fees can add thousands of dollars; they are separate from the permit fee itself.
Typical 2026 Permit Cost Ranges by Project Type
Every jurisdiction publishes its own fee schedule, so treat these as planning ranges for the permit fees alone (not the construction, and not the drawings):
- Fence, driveway, or shed — $100 to $500.
- Water heater, A/C changeout, or electrical panel — $100 to $400 per trade permit.
- Roof replacement — $300 to $900 depending on roof value and jurisdiction.
- Kitchen or bathroom remodel — $500 to $1,500 including trade sub-permits.
- Home addition — $1,500 to $5,000+, plus impact fees where they apply.
- New single-family home — commonly $8,000 to $20,000+ across all permit and impact fees.
- Pool — $800 to $2,000 including the required barrier/safety review.
The Costs Nobody Warns You About
Revisions and Rejected Plans
First submissions rarely pass every discipline on the first try. Each resubmission can carry a revision fee, and — more expensive than the fee — each cycle adds weeks to the timeline. Clean, permit-ready construction plans are the single best way to keep review cycles (and their costs) down. If your plans were already rejected, here's what to do next.
Expired Permits
A permit with no approved inspection for 180 days expires. Reactivating it means renewal fees, and if code editions changed since issuance, possible plan updates. Letting a permit expire repeatedly is one of the quietest ways a project's permit budget doubles — and open permits surface later at closing time.
After-the-Fact Permits (Work Done Without a Permit)
If work was done without a permit, most Miami-Dade jurisdictions charge a penalty of double to quadruple the normal permit fee, plus the cost of as-built drawings by a licensed architect or engineer, plus any corrections needed to bring the work up to code. Legalizing unpermitted work is almost always more expensive than permitting it correctly the first time — but far cheaper than the daily fines a code violation can accrue. We handle this end to end on our legalization service.
Permit Fees vs. Total Permitting Cost
The city's fee is only one piece of what it costs to get a project approved. A realistic permitting budget in Miami includes:
- Architectural drawings and engineering — signed and sealed plans are required for most structural work; see what documents a permit needs.
- Site plan or survey — many applications require a current survey or site plan.
- Product approvals — windows, doors, and roofing in the High-Velocity Hurricane Zone need Miami-Dade NOAs (Notices of Acceptance).
- HOA approval — if the property is in an association, HOA/ARC sign-off usually comes before the city; here's how HOA approval works.
- Permit expediting — professional handling of submissions, revisions, and inspections, which typically pays for itself in avoided resubmission cycles and shorter timelines.
How CORE GROUP Keeps Permit Costs Predictable
As a permit expediter and architecture firm under one roof, we quote the full permitting picture before you commit: city fees for your exact jurisdiction, the drawings your project actually needs, and a realistic timeline. Then we manage submissions, revisions, and inspections so fee-multiplying surprises — rejections, expirations, penalties — don't happen.
Planning a project in Miami-Dade or Broward? Contact us for a free assessment of what your permit will really cost in 2026.