Permits, plans and design in Orlando
Orlando · Orange County

Permits, plans and design in Orlando

Home additions, garage conversions, restaurant build-outs and rental-property upgrades — we prepare the plans and manage the permit with the City of Orlando or Orange County, in English or Spanish, from start to approval.

Local Knowledge

What's different about permitting in Orlando

Metro Orlando splits between city and county jurisdictions, layers in historic districts and moves almost everything through online plan review. Here's what we manage for you.

City or Orange County? Check first

Inside Orlando city limits, permits go through the City's Permitting Services; large parts of the metro — including Pine Hills, parts of Azalea Park and many subdivisions — are unincorporated Orange County. We confirm jurisdiction before a single sheet is drawn.

Fully electronic plan review

Orlando processes permits through online submission and electronic plan review. We format the drawings to the city's digital standards, upload, track reviewer comments and respond fast so your project doesn't sit in the queue.

Historic districts and overlay zones

Neighborhoods like Lake Eola Heights, Lake Lawsona and Colonialtown have historic-preservation review on top of the building permit. We prepare the extra documentation so exterior changes clear both boards.

Wind zone — but not HVHZ

Orange County follows the Florida Building Code wind provisions but is not in the High-Velocity Hurricane Zone, so windows, doors and roofing need Florida Product Approval rather than Miami-Dade NOAs. We spec exactly what your jurisdiction requires.

Impact fees on new square footage

Orange County charges impact fees on new homes and on additions that add living area, and they're often left out of early budgets entirely. We confirm which ones your project triggers before design, so the number doesn't surprise you at permit time.

Value-based fees, jurisdiction by jurisdiction

The City of Orlando, unincorporated Orange County and nearby cities like Winter Park, Ocoee and Apopka each publish their own fee schedule. All are based on construction value, but rates and minimums differ, so we price against the right one.

Statutory review deadlines

Florida Statute 553.792 sets the plan-review clock once an application is complete: 30 business days for single-family under 7,500 sq ft, 60 for single-family 7,500 sq ft or larger, 5 business days for work under $15,000 on an existing single-family home, and 60 for commercial under 25,000 sq ft. Source: orlando.gov Get-a-Permit/Permitting-Checklists/Building-Permit-Guidelines (read 2026-10-21).

Official permit portals

You can check permit status yourself — or let us handle every submission, comment and inspection for you.

Guía en español

Construction permit guide for Orlando

Read our in-depth Spanish-language guide covering costs, timelines and requirements step by step.

Leer la guía
Legalization

Open or unpermitted work?

See our permit legalization service to legalize existing construction and close open or expired permits.

See requirements
Timelines & fees

How long it takes and what your permit costs in Orlando

Review times under state law FL 553.792 and the city's residential fee formula, effective January 2026. All timelines count from a complete application.

Review times (FL 553.792) and the residential fee formula (1 or 2 units)
ItemTime or fee
Completeness check5 business days
Single-family home, under 7,500 sq ft30 business days
Single-family home, 7,500 sq ft or more60 business days
Existing single-family home, work under $15,0005 business days
Commercial under 25,000 sq ft (incl. multifamily up to 50 units)60 business days
Correcting rejection comments10 business days
Building permit fee$66.24 for the first $1,000 of construction cost or fraction thereof, plus $4.41 for each additional $1,000
Technology Surcharge3% of the permit fee
Concurrency Surcharge5% of the building permit fee
Administrative Inspection Fund1.5% of the building permit fee (minimum $2)
DCA Operational Trust Fund Surcharge1% of the building permit fee (minimum $2)

The city notes this fee table is still under review: "We are currently reviewing the amended permit fees required by HB803. Once approved, the updated fee schedule will be posted on our website." — amounts may change once the HB 803 update is posted.

The process

The 10-step permit process in Orlando

  1. 1

    Submit your permit application

    "Please allow two business days for processing after your application has been submitted."

  2. 2

    Submit plans

    Digitally, via the ProjectDox link emailed after your application is processed. Commercial projects pay a non-refundable 25% plan review deposit fee first.

  3. 3

    Submit a Recorded Notice of Commencement

    "If your project value exceeds $5,000 you will need to file a Notice of Commencement with the Orange County Comptroller's Office prior to starting any work." Post a certified copy at the job site and give a copy to the City.

  4. 4

    Check plan status

    Through the Permit Lookup tool. "Plan review times vary based on the plan review type (commercial vs. residential) and scope of work."

  5. 5

    Make a payment

    Payment instructions are emailed "after all reviews are completed and approved"; pay inside Permit Lookup.

  6. 6

    Download permit and plans

    From the ProjectDox Approved folder. "You must print them to scale and post on your job site to begin construction."

  7. 7

    Schedule an inspection

    "If your permit is open for six months without an inspection, it will expire."

  8. 8

    Check your permit status

    Pass inspections and the permit becomes final; not closing it "could cause issues later when trying to sell your property."

  9. 9

    Submit changes after a permit is issued

    Email a narrative to digitalpermits@orlando.gov to reopen the portal.

  10. 10

    Get your Certificate of Occupancy or Certificate of Completion

    Email digitalpermits@orlando.gov with the permit number in the subject.

Contact on that page: 407.246.2271, digitalpermits@orlando.gov, Permitting Services Division, 400 South Orange Avenue, 1st Floor, Orlando, FL 32801.

Sources
Services in Orlando

Everything your project needs, under one roof

Design, plans, renders, permits and HOA approvals — one bilingual team for residential and commercial projects in Orlando and Orange County.

PERMIT MANAGEMENT

Applications, revisions, open or expired permits and code violations handled end to end.

CONSTRUCTION PLANS

Permit-ready drawings for additions, remodels, pools, fences, roofs and more.

ARCHITECTURAL DESIGN

Residential and commercial design from concept to permit-ready documents.

3D VISUALIZATION

Photorealistic renders so you can see your project before it is built.

HOA & ARC APPROVALS

Complete application packages and board follow-up for community approvals.

LEGALIZATION OF UNPERMITTED WORK

We prepare the plans and permits needed to bring existing work up to code.

Common Questions

Permit questions we hear in Orlando

Do I permit with the City of Orlando or Orange County?

Inside Orlando city limits you file with the City; in unincorporated Orange County, with the county — and Winter Park, Ocoee, Apopka and other nearby cities each run their own departments. The fee schedules and processes differ.

How much are impact fees in the Orlando area?

For new homes and additions that add living area, Orange County's combined school, transportation and utility impact fees often total several thousand dollars or more — frequently the single largest permitting cost. Confirm them before designing.

Do I need HOA approval before permitting in Orlando?

Much of the Orlando area is deed-restricted, and most HOAs require Architectural Review approval before exterior work. Many jurisdictions expect that sign-off before or alongside the permit application.

What happens if work was done without a permit in Orlando?

It gets legalized through an after-the-fact permit: penalty fees typically double to quadruple the standard fee, plus as-built plans by a licensed professional and corrections to meet current code.

How much does a building permit cost in Orlando?

Fees are based on the declared construction value; a practical planning figure is 1.5% to 3% of construction value for typical residential work. On new homes and additions, impact fees are often the largest single item.

Do windows and roofs in Orlando need Miami-Dade NOAs?

No. Orange County is not in the High-Velocity Hurricane Zone, so windows, doors and roofing need Florida Product Approval for the site's wind zone instead.

My Orlando permit came back with comments. What now?

Answer every comment completely in one resubmission. Each new cycle adds review time and often a revision fee, so a full, code-compliant response is the fastest way to approval.

Your permit partner in Orlando
Why CORE GROUP

Your permit partner in Orlando

We sort out city-vs-county jurisdiction, historic overlays and electronic plan review so your Orlando project moves from idea to approved permit without surprises — with one bilingual point of contact.

  • One firm from design to approved permit
  • Bilingual team — every step in English or Spanish
  • Direct communication with the building department
  • Complete, code-compliant submissions the first time

Have a project in Orlando?

Tell us about it and get a free consultation.

CONTACT US