
Home additions, garage conversions, restaurant build-outs and rental-property upgrades — we prepare the plans and manage the permit with the City of Orlando or Orange County, in English or Spanish, from start to approval.
Metro Orlando splits between city and county jurisdictions, layers in historic districts and moves almost everything through online plan review. Here's what we manage for you.
Inside Orlando city limits, permits go through the City's Permitting Services; large parts of the metro — including Pine Hills, parts of Azalea Park and many subdivisions — are unincorporated Orange County. We confirm jurisdiction before a single sheet is drawn.
Orlando processes permits through online submission and electronic plan review. We format the drawings to the city's digital standards, upload, track reviewer comments and respond fast so your project doesn't sit in the queue.
Neighborhoods like Lake Eola Heights, Lake Lawsona and Colonialtown have historic-preservation review on top of the building permit. We prepare the extra documentation so exterior changes clear both boards.
Orange County follows the Florida Building Code wind provisions but is not in the High-Velocity Hurricane Zone, so windows, doors and roofing need Florida Product Approval rather than Miami-Dade NOAs. We spec exactly what your jurisdiction requires.
Orange County charges impact fees on new homes and on additions that add living area, and they're often left out of early budgets entirely. We confirm which ones your project triggers before design, so the number doesn't surprise you at permit time.
The City of Orlando, unincorporated Orange County and nearby cities like Winter Park, Ocoee and Apopka each publish their own fee schedule. All are based on construction value, but rates and minimums differ, so we price against the right one.
Florida Statute 553.792 sets the plan-review clock once an application is complete: 30 business days for single-family under 7,500 sq ft, 60 for single-family 7,500 sq ft or larger, 5 business days for work under $15,000 on an existing single-family home, and 60 for commercial under 25,000 sq ft. Source: orlando.gov Get-a-Permit/Permitting-Checklists/Building-Permit-Guidelines (read 2026-10-21).
You can check permit status yourself — or let us handle every submission, comment and inspection for you.
Read our in-depth Spanish-language guide covering costs, timelines and requirements step by step.
See our permit legalization service to legalize existing construction and close open or expired permits.
Review times under state law FL 553.792 and the city's residential fee formula, effective January 2026. All timelines count from a complete application.
| Item | Time or fee |
|---|---|
| Completeness check | 5 business days |
| Single-family home, under 7,500 sq ft | 30 business days |
| Single-family home, 7,500 sq ft or more | 60 business days |
| Existing single-family home, work under $15,000 | 5 business days |
| Commercial under 25,000 sq ft (incl. multifamily up to 50 units) | 60 business days |
| Correcting rejection comments | 10 business days |
| Building permit fee | $66.24 for the first $1,000 of construction cost or fraction thereof, plus $4.41 for each additional $1,000 |
| Technology Surcharge | 3% of the permit fee |
| Concurrency Surcharge | 5% of the building permit fee |
| Administrative Inspection Fund | 1.5% of the building permit fee (minimum $2) |
| DCA Operational Trust Fund Surcharge | 1% of the building permit fee (minimum $2) |
The city notes this fee table is still under review: "We are currently reviewing the amended permit fees required by HB803. Once approved, the updated fee schedule will be posted on our website." — amounts may change once the HB 803 update is posted.
"Please allow two business days for processing after your application has been submitted."
Digitally, via the ProjectDox link emailed after your application is processed. Commercial projects pay a non-refundable 25% plan review deposit fee first.
"If your project value exceeds $5,000 you will need to file a Notice of Commencement with the Orange County Comptroller's Office prior to starting any work." Post a certified copy at the job site and give a copy to the City.
Through the Permit Lookup tool. "Plan review times vary based on the plan review type (commercial vs. residential) and scope of work."
Payment instructions are emailed "after all reviews are completed and approved"; pay inside Permit Lookup.
From the ProjectDox Approved folder. "You must print them to scale and post on your job site to begin construction."
"If your permit is open for six months without an inspection, it will expire."
Pass inspections and the permit becomes final; not closing it "could cause issues later when trying to sell your property."
Email a narrative to digitalpermits@orlando.gov to reopen the portal.
Email digitalpermits@orlando.gov with the permit number in the subject.
Contact on that page: 407.246.2271, digitalpermits@orlando.gov, Permitting Services Division, 400 South Orange Avenue, 1st Floor, Orlando, FL 32801.
Design, plans, renders, permits and HOA approvals — one bilingual team for residential and commercial projects in Orlando and Orange County.
Applications, revisions, open or expired permits and code violations handled end to end.
Permit-ready drawings for additions, remodels, pools, fences, roofs and more.
Residential and commercial design from concept to permit-ready documents.
Photorealistic renders so you can see your project before it is built.
Complete application packages and board follow-up for community approvals.
We prepare the plans and permits needed to bring existing work up to code.
Inside Orlando city limits you file with the City; in unincorporated Orange County, with the county — and Winter Park, Ocoee, Apopka and other nearby cities each run their own departments. The fee schedules and processes differ.
For new homes and additions that add living area, Orange County's combined school, transportation and utility impact fees often total several thousand dollars or more — frequently the single largest permitting cost. Confirm them before designing.
Much of the Orlando area is deed-restricted, and most HOAs require Architectural Review approval before exterior work. Many jurisdictions expect that sign-off before or alongside the permit application.
It gets legalized through an after-the-fact permit: penalty fees typically double to quadruple the standard fee, plus as-built plans by a licensed professional and corrections to meet current code.
Fees are based on the declared construction value; a practical planning figure is 1.5% to 3% of construction value for typical residential work. On new homes and additions, impact fees are often the largest single item.
No. Orange County is not in the High-Velocity Hurricane Zone, so windows, doors and roofing need Florida Product Approval for the site's wind zone instead.
Answer every comment completely in one resubmission. Each new cycle adds review time and often a revision fee, so a full, code-compliant response is the fastest way to approval.

We sort out city-vs-county jurisdiction, historic overlays and electronic plan review so your Orlando project moves from idea to approved permit without surprises — with one bilingual point of contact.