
Remodels, additions, restaurant build-outs and open-permit closures — we design, draw and manage your permit through the City of Miami's iBuild portal or Miami-Dade County, in English or Spanish.
Miami is one of the most demanding permitting environments in Florida. These are the local factors we manage for you.
The City of Miami runs permits through its iBuild online portal — digital submissions, electronic plan review and online inspections. We prepare, upload and track everything so comments get answered fast.
All of Miami-Dade is in the HVHZ: windows, doors, roofing and shutters need Miami-Dade NOAs or Florida Product Approval. We specify compliant products on your plans from the start.
Buying or selling in Miami often surfaces open or expired permits from past work. We research the history, complete the missing inspections or plans and close them out with the city.
Miami's form-based zoning code (Miami 21) governs setbacks, lot coverage and use for every property. We verify what your transect zone allows before designing, so your project is approvable from day one.
The core fee is a percentage of the declared construction value, then plan review per discipline, state surcharges and certificate fees are added. Impact fees on added living area are separate.
A permit with no approved inspection for 180 days expires. Reactivating it means renewal fees and, if the code changed since it was issued, possible plan updates. We keep inspections moving so your permit stays alive.
Starting work before a permit is issued costs 2x the fee schedule for Homestead properties or 4x for non-Homestead/commercial, plus a base fee (City of Miami Fee Schedule, Sec. 10-18). Source: miami.gov Permits-Construction/Permitting-Resources/City-of-Miami-Building-Permit-Fee-Schedule (read 2026-10-21).
You can check permit status yourself — or let us handle every submission, comment and inspection for you.
Read our in-depth Spanish-language guide covering costs, timelines and requirements step by step.
See Miami's legalization requirements to legalize existing construction and close open or expired permits.
Florida law (F.S. 553.79(1)(a)) bars constructing, altering, modifying or repairing any building in the state without first getting a permit from the local enforcing agency. The 2026 HB 803 law carved out a narrow exception for small jobs on single-family homes. Here is exactly what it says, nothing more.
The online platform where permits are applied for and contractors are managed. All building permits must be applied for electronically there.
Project plans and documents are reviewed in ProjectDox, the city's ePlan Review system.
Search it in iBuild (search bar, Global Inquiry, or Manage Application → Search Process Number) and read the Plan Status tab.
Inside the record, use the General, Plan History, Review Status and Event tabs; Plan Review reports show the workflow routing slip and review comments.
Send your name, address and process number to eplanbuilding@miamigov.com.
In Global Inquiry, use the "+" next to the permit and open "Why Not Final" to see what's still missing before close-out.
HOA vs. condo order: state law (F.S. 720.3035(1)(c)) says a homeowners' association (HOA, under chapter 720) cannot require a building permit to be issued before it reviews your project. For condominiums (chapter 718) we found no equivalent rule — that order stays FALTA; we did not guess.
Design, plans, renders, permits and HOA approvals — one bilingual team for residential and commercial projects in Miami.
Applications, revisions, open or expired permits and code violations handled end to end.
Permit-ready drawings for additions, remodels, pools, fences, roofs and more.
Residential and commercial design from concept to permit-ready documents.
Photorealistic renders so you can see your project before it is built.
Complete application packages and board follow-up for community approvals.
We prepare the plans and permits needed to bring existing work up to code.
Miami addresses can fall under the City of Miami, unincorporated Miami-Dade, or another municipality entirely — and the permitting process differs for each. We confirm the jurisdiction from the folio before preparing anything.
Miami-Dade requires milestone structural and electrical recertification of older buildings. If your building is due, a licensed professional inspects it and files a report; any required repairs then need their own permits.
An open permit needs its remaining inspections completed — sometimes with updated plans or an engineer's certification if the original contractor is gone. Open permits surface in title searches and can hold up a sale, so it pays to close them early.
Yes. Windows, doors, shutters and roofing in all of Miami-Dade need Miami-Dade NOAs. Plans that specify approved products up front avoid the most common review comments.
There's no single fee. It depends on the jurisdiction, the type of work and the declared construction value. For typical residential work, plan on roughly 1.5% to 3% of construction value in total permit-related fees; impact fees on new construction are extra.
Most Miami-Dade jurisdictions charge double to quadruple the normal permit fee as a penalty, plus as-built drawings by a licensed architect or engineer and any corrections needed to meet current code.
Yes. Every step, from the first call to the final inspection, can be handled in English or Spanish.

From Miami 21 zoning checks to HVHZ product approvals and open-permit closures, we handle the details that make Miami permits complicated — so you don't have to.