
Building permits inside city limits come from the City of Miami Building Department, which enforces the building codes and regulations within the city. Its page directs applicants to the iBuild portal to apply for permits and check permit status.
Everyday complaints go to the Code Compliance Department, which takes reports through 311. Building violations are a separate category: the city's Respond to a Building Violation page names three kinds, "Unsafe Structure", "Work Without Permit" and "40/50 Year Violation".
According to the city, this violation can be issued when unpermitted construction is taking place, or when construction is taking place outside of a given permit. In other words, having a permit on file does not protect a job that grew past what was approved.
The city's first instruction is to contact the Unsafe Structures department to determine the cause of your violation (unsafestructures@miamigov.com or 305-416-1177). Knowing exactly what was cited decides what has to be drawn, permitted, corrected or removed. One shortcut is off the table: the city states that if you have a violation, you cannot apply for an Easy Permit. Read the city's page.
If the case is not resolved, the city warns it may be sent to the Unsafe Structures panel and the property may be deemed an unsafe structure, and a lien can follow. Panels, fines and liens belong to the city and, for advice, to an attorney; CORE GROUP does not give legal advice. Our job is to get the permit work moving.
The City of Miami Building Permit Fee Schedule names a Code Relief Program (City Code Sec. 10-74) and an ADU Amnesty Program (Sec. 10-77(d)(3)). The pages we reviewed do not explain who qualifies or what the steps are, so confirm with the Building Department whether your project fits either one before you plan around it.
The City of Miami is one of the municipalities bound by the guidelines that Miami-Dade's Board of Rules and Appeals (BORA) sent to every building official in the county in January 2026. For construction done without a permit, they call for a Work Without Permit Certificate prepared, signed and sealed by a Florida-licensed Professional Engineer or Registered Architect. They do not cover missed inspections on permitted work, and they exclude work begun before March 1, 2002. Read the BORA memo.
We start with the notice and the property records: what was cited, and which permits are open, expired or closed. Then we inspect the work, prepare the as-built plans in-house, put together the after-the-fact application, answer reviewer comments and coordinate inspections until the permit closes. With the property in compliance, you or your attorney can take up any fine or lien with the city.
Learn more about legalizing a property in Miami, see our Miami page or read the code violations overview.
The city's page tells owners to contact the Building Department's Unsafe Structures Division to find out the cause of the violation, at unsafestructures@miamigov.com or 305-416-1177. Once the cause is clear, we can prepare the plans and the permit application. Source.
The city says this violation can also be issued when construction goes outside of a given permit. If the work exceeded what was approved, the extra work generally needs to be permitted, corrected or removed. We compare what was built against what the permit covered.
No. The City of Miami states that if you have a violation, you cannot apply for an Easy Permit, so the work goes through a regular permit application.
Yes. The memo says the guidelines are county-wide and must be followed across all municipalities. They require a certificate signed and sealed by a Florida-licensed engineer or architect, and they exclude work begun before March 1, 2002 and missed inspections on permitted work. BORA memo.
Call us at (954) 880-9760 or tell us about your property with the form below. The first consultation is free.
Call (954) 880-9760Share your project details and any plans, photos, or documents - we'll review and respond quickly.