An "open permit" is a building permit that was issued but never officially closed — usually because the final inspection was never passed. In Miami-Dade County, open and expired permits are one of the most common problems homeowners discover, often years after the work was done, and usually at the worst possible moment: when trying to sell or refinance the property.
The good news: open permits can be closed, even if they're a decade old, even if the original contractor is long gone, and even if the work was never finished. This guide walks you through how to find open permits on your property, how the closure process works in Miami-Dade and its cities, and when it makes sense to bring in a permit specialist to handle it for you.
What Is an Open Permit — and Why It's a Problem
Every building permit follows a life cycle: it's issued, the work is done, inspections are passed, and the permit receives a final approval that closes it. If any step is skipped — most often the final inspection — the permit stays "open" in the county or city system indefinitely. If enough time passes without an approved inspection (typically 180 days), the permit becomes "expired" while still remaining open.
Open permits create real consequences:
- Title and closing problems — most lenders and title companies flag open permits during a sale or refinance, and many deals stall until they're resolved.
- Code enforcement action — an expired permit can trigger violations, daily fines, and even liens against the property.
- Insurance risk — unclosed work may not be covered if something goes wrong.
- Inherited liability — when you buy a property, you inherit its open permits, even ones from previous owners.
Step 1: Find Every Open Permit on the Property
Before anything can be closed, you need the full picture. In Miami-Dade, permits are held by different jurisdictions depending on where the property sits: unincorporated Miami-Dade uses the county's online permit system, while cities like Miami, Hialeah, Miami Beach, Coral Gables, and Doral each run their own permit portals.
Search by the property address or folio number and list every permit that isn't marked final, completed, or closed. Pay attention to the permit type (building, electrical, plumbing, mechanical, roofing) — a single project often has several sub-permits, and each one must be closed individually. If you're not sure which jurisdiction to search, a permit professional can run a complete multi-jurisdiction search for you.
Step 2: Determine the Status of Each Permit
How a permit gets closed depends on its current status:
- Open and active — the work is done but the final inspection was never called in. Often the simplest case: schedule and pass the remaining inspections.
- Expired — no approved inspection within the required window. The permit must be renewed or reactivated (with fees) before inspections can be scheduled.
- Expired with an inactive contractor — the contractor who pulled the permit is out of business, unreachable, or unwilling to help. The permit generally needs to be transferred to a new contractor or to the owner before it can move forward.
- Work never completed or doesn't match the plans — the remaining work must be finished, or revised plans submitted, before final inspection.
Step 3: Reactivate, Inspect, and Close
With the status clear, the closure path in Miami-Dade generally looks like this:
- 1. Renew or reactivate expired permits — pay the renewal fees and, for older permits, address any code updates the jurisdiction requires.
- 2. Replace the contractor of record if needed — via a change-of-contractor form or, in qualifying cases, an owner-builder affidavit.
- 3. Complete any outstanding work — bring the project to the point where it can pass inspection, which may require updated drawings from a licensed professional.
- 4. Schedule the required inspections — in the correct order (rough inspections before finals, sub-permits before the master building permit).
- 5. Pass the final inspection — once every required inspection is approved, the jurisdiction marks the permit closed or final.
What If the Work Is Hidden Behind Walls?
A common complication with old permits: the work that needs inspecting (wiring, plumbing, framing) is now sealed behind drywall. Inspectors can't approve what they can't see. Depending on the jurisdiction and the inspector, solutions range from limited exploratory openings to a letter from a licensed engineer certifying the concealed work. This is one of the areas where experienced local guidance saves the most time and money.
What If the Work Was Done Without Any Permit?
Sometimes the search reveals a different problem: work that was done with no permit at all. That's not an open-permit closure — it's a legalization, also called an after-the-fact permit. The process involves having a licensed architect or engineer document the existing work, submitting as-built plans, and obtaining an after-the-fact permit (typically with penalty fees) so the work can be inspected and approved.
We cover this in depth on our open permits and legalization service page — including how legalization works in Miami-Dade and what it typically costs in time and fees.
How CORE GROUP Closes Open Permits for You
Closing an open permit sounds procedural, but in practice it means navigating the county's and each city's systems, coordinating contractors and inspectors, and knowing how each jurisdiction handles expired permits, missing contractors, and concealed work. That's exactly what our permit team does every day across Miami-Dade and Broward.
We run a full permit search on your property, build a closure plan for every open item, prepare or update any plans and documents the jurisdiction requires, and manage inspections through to final approval. If you're facing a closing deadline, tell us — open-permit resolution for pending sales is one of our most common requests. Contact us for a free assessment of what's open on your property and what it will take to close it.