A detailed architectural site plan showing property boundaries, setbacks, and building footprint for a Florida project
Back to Knowledge Center
SITE PLANS

What Is a Site Plan?

Published June 15, 202610 min read

If you've started a permit application in Florida, chances are the building department asked for a site plan — and if you're like most homeowners and business owners, your first reaction was to wonder exactly what that means. A site plan is one of the most commonly requested documents in the entire permitting process, and getting it wrong is one of the most common reasons applications get rejected.

In simple terms, a site plan is a scaled, top-down drawing of your property that shows where everything sits: the boundaries, the existing structures, and whatever you're proposing to build. Plan reviewers use it to confirm your project respects setbacks, zoning rules, and safety requirements before they'll issue a permit. This guide explains what a site plan includes, when you need one, and how to make sure yours gets approved the first time.

If you already know you need a site plan for permit submission, our team draws it on a current survey, to your jurisdiction's checklist.

What a Site Plan Actually Shows

A site plan is drawn to scale — meaning distances on the drawing accurately represent distances on the ground — and viewed from directly above, like a map of your lot. It gives the plan reviewer a complete picture of your property and how your project fits within it.

While every jurisdiction has its own checklist, most Florida building departments expect a site plan to include:

  • Property lines and lot dimensions, usually tied to a boundary survey.
  • Setbacks — the required distances between structures and each property line.
  • All existing structures: the home, garage, sheds, driveways, and pools.
  • The proposed work, clearly labeled and dimensioned.
  • A north arrow and drawing scale (for example, 1" = 20').
  • Easements, right-of-way lines, and any utility locations.
  • Impervious surface coverage and, in many cases, drainage or grading notes.

Site Plan vs. Survey: They're Not the Same Thing

People often use "site plan" and "survey" interchangeably, but they're different documents. A boundary survey is prepared by a licensed Florida surveyor and legally establishes exactly where your property lines are. A site plan builds on that survey to show your proposed project.

Think of the survey as the foundation of fact — the certified measurements of your lot — and the site plan as the design layered on top, showing what you want to add and proving it complies with local rules. Many Florida jurisdictions require a recent survey as the base for any site plan, especially for additions, pools, and new construction.

When Do You Need a Site Plan?

Not every permit requires a full site plan, but many do. Any project that changes your property's footprint or adds a new structure will almost always trigger the requirement.

  • Home additions and new construction.
  • Pools, spas, and screen enclosures.
  • Fences, sheds, and detached garages.
  • Driveways, patios, and other impervious surfaces.
  • Commercial build-outs and parking modifications.

When You Might Not Need One

Interior-only work — like a kitchen remodel that doesn't change the building footprint — often doesn't require a site plan. The same goes for many simple trade permits such as a water heater swap or an electrical panel change. When you're unsure, it's worth confirming before you submit, because guessing wrong means a rejection and a delay.

What Reviewers Check, Project by Project

The same lot drawing gets read differently depending on what you're building. These are the points plan reviewers focus on for the projects we see most:

  • Additions and new construction — setbacks from every property line, measured on a current survey, plus lot coverage after the new footprint is added.
  • Pools and spas — distance to property lines and the house, and where the safety barrier runs. The site plan goes in with the survey, the engineered pool plans and any HOA approval.
  • Fences — the fence line drawn inside your property, with heights by yard. A survey is the only reliable way to show where the line is, and corner lots get extra scrutiny for visibility.
  • Driveways — existing and proposed driveway with dimensions, impervious coverage, and the apron in the public right-of-way, which usually needs its own permit. More in our driveway permit guide.
  • HOA and ARC applications — most associations want a site plan showing exactly where the work goes on the lot, alongside drawings and product specs. See how HOA approval works.

Why Florida Building Departments Care So Much

A site plan is how your city or county verifies that your project respects zoning setbacks, doesn't encroach on easements, and won't create drainage problems for you or your neighbors. In much of Florida, stormwater and flood-zone considerations make this especially important — a poorly placed structure or too much impervious surface can affect how water drains across an entire block.

The site plan also protects you. It creates a permanent record of what was approved, which matters when you sell the property, refinance, or file an insurance claim. Getting the site plan right isn't bureaucratic box-checking; it's the document that keeps your project legal and your investment protected.

Common Site Plan Mistakes That Cause Rejections

Plan reviewers reject site plans every day, and the reasons are usually avoidable. The most frequent problems we see are:

  • Missing or incorrect setback dimensions.
  • Using an outdated survey that doesn't reflect current structures.
  • Leaving off easements or right-of-way lines.
  • No scale or north arrow, making the drawing impossible to verify.
  • Ignoring impervious surface limits or drainage requirements.

How to Avoid Them

The safest path is to have your site plan prepared by professionals who know exactly what your jurisdiction expects. CORE GROUP prepares site plans built to your local building department's standards, cross-checked against zoning and setback rules before submission. If your project also needs a permit, we manage the full application through approval.

What to Have Ready Before You Order a Site Plan

A site plan is only as good as the information under it. Gathering these first saves a round of back-and-forth:

  • Your current boundary survey, if you have one, and its date. If it's old or doesn't show recent work, a new survey is usually step one.
  • The property address and folio number, so the jurisdiction and zoning can be confirmed.
  • A clear description of the work: what's being built, its size, and where on the lot.
  • Any HOA or ARC requirements, if you live in an association.
  • Previous permits or plans for the property, if available. They show what's already approved.

Site Plan Requirements by City

Every city keeps its own checklist. This is what the official pages said when we read them on November 3, 2026. Where we could not verify the official source, it says FALTA (not verified) instead of a guess.

Orlando

Orlando's residential permitting requirements say: "Your site plan or survey must include":

  • Property lines with lot dimensions.
  • Adjacent street locations and names.
  • Easements and a north arrow.
  • Total building site area in square feet, and lot area.
  • Dimensions of any existing or proposed buildings.
  • Impervious Surface Ratio (ISR) calculations.
  • Dimensions and locations of A/C or mechanical equipment pads, pool equipment, porches, patios and steps, the driveway and driveway approach, curb, street pavement edge, public sidewalk and on-site walkways, and structure projections and roof overhangs.
  • Locations of existing trees.
  • Distances from property lines to existing and proposed improvements, and distances between them.
  • Clear identification of existing conditions and proposed work.

Orlando review time

Orlando's Building Permit Guidelines (FL 553.792) put site plans with commercial projects under 25,000 sq ft: reviewed "within 60 business days" of a complete application. The completeness check takes up to 5 business days, and rejection comments must be corrected within 10 business days.

Tampa

Since January 6, 2025, Tampa no longer reviews site and building at the same time. You get site, Natural Resource and zoning approval under a Site Plan Review (SPR) record first, then submit the building permit application (Tampa sufficiency checklist). Site plan review applications: 60 business days, per Tampa's Waiver of Review Time Limits form (F.S. 553.792).

Miami

FALTA (not verified). miami.gov blocked our reads (HTTP 403) on November 3, 2026, so we have not verified the City of Miami's site plan checklist.

Hialeah

FALTA (not verified). We found no site plan checklist on the Hialeah Building Department page.

Fort Lauderdale

FALTA (not verified). fortlauderdale.gov blocked our reads (HTTP 403) on November 3, 2026.

Building in one of these cities?

We prepare your site plan to the checklist your jurisdiction uses.

How to Get Your Site Plan Prepared

You can draw a basic site plan yourself for very simple projects, but anything involving setbacks, drainage, or new structures is best left to a professional. A properly prepared site plan the first time is almost always faster and cheaper than a rejection followed by revisions.

At CORE GROUP we prepare site plans and the full set of documents your permit requires, across Florida. We confirm your jurisdiction's specific requirements, build the drawing on a current survey, and submit a package that plan reviewers are ready to approve. If you have questions about your project, reach out and we'll walk you through it.

Frequently Asked Questions

For very simple projects, some jurisdictions accept an owner-drawn site plan as long as it's to scale and includes all required information. For additions, pools, and new construction, most departments expect a professionally prepared plan built on a current survey — and getting it right avoids costly rejections.

Get a Site Plan That Passes Review the First Time

We draw your site plan on a current survey, to your jurisdiction's checklist: property lines, setbacks, easements and drainage notes. Then we can take the permit through approval.

Learn about this service: CORE Site Plans